We maintain over 4,600 kilometres of road network across the county on behalf of our communities. This includes: 

  • 532 km of A-road network
  • 578 km of B-road network
  • 3,498 km of C and Unclassified Road network
  • In 2023, 5.1 billion vehicle miles were travelled in Cambridgeshire, an increase of over half a billion vehicle miles in ten years.
  • Over 40% of our network is built over peat soil which present unique challenges as it is structurally weak.
Road with two lanes with grass and bushes on both sides

The information here provides details on the planned repairs to roads that we will be undertaking across the county.

The scale and type of work will vary depending on the individual scheme and the repair being undertaken.

Most work will be delivered under a full road closure. This will cause disruption to the road network whilst we are on site. We will keep disruption to a minimum and we appreciate your cooperation during these critical works.

As well as the large-scale work on roads, planned in advance, we also continually do reactive road repairs across the whole county. These include pothole repairs and patching work, which is carried out on defects that we spot through routine inspection or if an issue has been reported by a member of the public. This helps keep the highways network running smoothly.

Planned work by district

Updates are provided monthly by officers. Expand the district below to see when and where work will take place and road closures.

Whilst we aim to be as accurate as possible with the below times and dates, there are instances where these may change at short notice.

Large-scale road maintenance

Our large-scale road maintenance involves reconstruction to replace the top layers of the road and provide a stable support for vehicle movement. Works include, where needed, vegetation clearance, drainage, signage and road markings.

2025-2026 programmes

Parish / Town Road Start date Duration
Cambridge Parker Street To be confirmed  
Cambridge Jesus Lane To be confirmed  
Cambridge East Road To be confirmed  
Cambridge Cherry Hinton Road To be confirmed  
Cambridge Gonville Place To be confirmed  
Cambridge Round Church Street To be confirmed  
Cambridge Hauxton Road Roundabout To be confirmed  

Surface treatment work

We use different types of surface treatments to repair your roads, to learn why please visit our types of road surface treatment page.

2025-2026 programmes

Parish / Town Road Start date Duration Type of work
Queen Ediths Godwin Close 11 April 2025 Completed Micro asphalt
Queen Ediths Gunhild Close 11 April 2025 Completed Micro asphalt
Queen Ediths Gunhild Court 11 April 2025 Completed Micro asphalt
Queen Ediths Gunhild Way 12 April 2025 Completed Micro asphalt
Queen Ediths Godwin Way 13 April 2025  Completed Micro asphalt
Cherry Hinton St Thomas's Square 14 April 2025 Completed Micro asphalt
Cherry Hinton St Thomas's Road 15 April 2025 Completed Micro asphalt
Coleridge Suez Road  15 April 2025  Completed Micro asphalt
East Chesterton Evergreens  16 April 2025  Completed Micro asphalt
Arbury Harris Road 16 April 2025  2 days. Road closures between 9.30am and 2.30pm Micro asphalt
Arbury Perse Way 16 April 2025  4 days. Road closure and diversion between 9.30am and 2.30pm Micro asphalt
Arbury Durnford Way  23 April 2025 1 day. Road closures between 9.30am and 2.30pm Micro asphalt
Arbury Redfern Close 23 April 2025 2 days. Road closures between 9.30am and 2.30pm Micro asphalt
Arbury Montgomery Close 24 April 2025 1 day. Road closure and diversion between 9.30am and 2.30pm Micro asphalt
Arbury Essex Close 24 April 2025  1 day. Road closures between 9.30am and 2.30pm Micro asphalt
Arbury Cunningham Close 24 April 2025 1 day. Road closures between 9.30am and 2.30pm Micro asphalt
Arbury Roland Close 24 April 2025 2 days. Road closures between 9.30am and 2.30pm Micro asphalt
Arbury Wavell Way 26 April 2025 1 day. Road closures between 9.30am and 2.30pm Micro asphalt
Arbury Wynborne Close 26 April 2025 1 day. Road closures between 9.30am and 2.30pm Micro asphalt
Arbury Brimley Road 26 April 2025 1 day. Road closure and diversion between 9.30am and 2.30pm Micro asphalt
Coleridge Coleridge Road 10 May 2025 3 days. Road closure and diversion between 9.30am and 2.30pm Gripfibre (Micro asphalt)

Large-scale road maintenance

Our large-scale road maintenance involves reconstruction to replace the top layers of the road and provide a stable support for vehicle movement. Works include, where needed, vegetation clearance, drainage, signage and road markings.

2025-2026 programmes

Parish / Town Road Start date Duration
Ely The Gallery To be confirmed  
Isleham Mildenhall Road To be confirmed  
Ely Broad Street To be confirmed  
Little Downham Hundred Foot Bank To be confirmed  
Stuntney Stuntney Causeway To be confirmed  
Littleport Ponts Hill To be confirmed  
Soham Great Fen Road To be confirmed  
Ely Kings Avenue To be confirmed  
Isleham Prickwillow Road To be confirmed  
Pymoor Straight Furlong To be confirmed  

Surface treatment work

We use different types of surface treatments to repair your roads, to learn why please visit our types of road surface treatment page.

2025-2026 programmes

Parish / Town Road Start date Duration Type of work
Little Downham Kiln Close 7 April 2025 Completed Micro asphalt
Little Downham Orchard Estate 7 April 2025 Completed Micro asphalt
Fordham Murfitts Lane 9 April 2025 Completed Micro asphalt
Stetchworth Hall Farm 12 May 2025 7 days. Road closure and diversion between 9.30am to 3.30pm Gripfibre (Micro asphalt)
Burrough Green B1061 Bradley Road 20 May 2025 4 days. Road closure and diversion between 9.30am to 2.30pm Gripfibre (Micro asphalt)
Dullingham Station Road 21 May 2025 1 day. Road closures between 8am and 5pm Surface dressing
Chippenham Snailwell Road  22 May 2025 1 day. Road closures between 8am and 5pm Surface dressing
Ely, Little Thetford A10 Cambridge Road 23 May 2025 1 day. Road closures between 9.30am to 3.30pm Surface dressing
Wilburton Pools Road 27 May 2025 1 day. Road closures between 8am and 5pm Surface dressing
Coveney Main Street 27 May 2025 1 day. Road closures between 9.30am to 3.30pm Surface dressing
Ely High Barns 31 May 2025 3 days. Road closures between 9.30am to 2.30pm Gripfibre (Micro asphalt)

Crack sealing

2025-2026 programmes

Parish / Town Road Start date Duration
Ely Cam Drive To be confirmed  
Soham The Shade, Townsend, Hall Street To be confirmed  

Large-scale road maintenance

Our large-scale road maintenance involves reconstruction to replace the top layers of the road and provide a stable support for vehicle movement. Works include, where needed, vegetation clearance, drainage, signage and road markings.

2025-2026 programmes

Parish / Town Road Start date Duration
Whittlesey Eastrea Road 7 April 2025 3 weeks. Road closures between 8pm and 6am, Monday to Friday.
Chatteris High Street To be confirmed  
Wisbech Norwich Road To be confirmed  
Manea Station Road To be confirmed  
March Creek Road To be confirmed  
Chatteris Bridge Street To be confirmed  
Coates Coates Road To be confirmed  
Leverington Gorefield Road To be confirmed  
Wisbech Ramnoth Road To be confirmed  
Gorefield Harolds Bank To be confirmed  
Manea Wimblington Road To be confirmed  
Wisbech Ollard Avenue To be confirmed  
Wisbech St Michaels Avenue To be confirmed  
Chatteris Sixteen Foot Bank To be confirmed  
Doddington Floods Ferry Road To be confirmed  
March City Road To be confirmed  
Murrow Black Drove To be confirmed  
Parson Drove Silvers Lane To be confirmed  
Wimblington Hook Road To be confirmed  
Murrow Cants Drove To be confirmed  

Surface treatment work

We use different types of surface treatments to repair your roads, to learn why please visit our types of road surface treatment page.

2025-2026 programmes

Parish / Town Road Start date Duration Type of work
Wisbech Les Baux Place 1 April 2025 Completed Micro asphalt
Wisbech Provence Place 1 April 2025 Completed Micro asphalt
Wisbech Rhone Place 1 April 2025 Completed Micro asphalt
Wisbech Arles Avenue 1 April 2025 Completed Micro asphalt
Wisbech Camargue Place 2 April 2025 Completed Micro asphalt
Gorefield St Marks Road 2 April 2025 Completed Micro asphalt
Wimblington Orchard Way 3 April 2025 Completed Micro asphalt;
Wimblington Fenland Close 3 April 2025 Completed Micro asphalt
Wimblington King Street 3 April 2025 Completed Micro asphalt
Whittlesey Mountbatten Way 9 April 2025 Completed Micro asphalt
Whittlesey Windsor Place 8 April 2025 Completed Micro asphalt
Whittlesey Bellmans Grove 10 April 2025 Completed Micro asphalt
Whittlesey Chestnut Crescent 10 April 2025 Completed Micro asphalt
Whittlesey Hawthorne Drive 11 April 2025 Completed Micro asphalt
Whittlesey Commons Road 11 April 2025 Completed Micro asphalt
Tipps End B1100 March Road 11 May 2025 1 day. Road closure and diversion between 8am and 5pm Surface dressing
Tydd St Giles B1165 Church Lane 11 May 2025 1 day. Road closure and diversion between 9.30am to 2.30pm Surface dressing
Newton in the Isle B1165 High Road 12 May 2025 1 day. Road closure and diversion between 9.30am to 2.30pm Surface dressing
Turves C71 Burnt House Road 12 May 2025  2 days. Road closure and diversion between 7.30am to 7pm Monday to Friday. 8am to 5pm at weekend. Surface dressing

Crack sealing

2025-2026 programmes

Parish / Town Road Start date Duration
Wisbech Mansell Road To be confirmed  
Wisbech Willow Way To be confirmed  
Wisbech Queen Elizabeth Drive To be confirmed  
Wisbech Falklands Drive To be confirmed  
March Upwell Road To be confirmed  
Doddington Newgate Street To be confirmed  

Large-scale road maintenance

Our large-scale road maintenance involves reconstruction to replace the top layers of the road and provide a stable support for vehicle movement. Works include, where needed, vegetation clearance, drainage, signage and road markings.

2025-2026 programmes

Parish / Town Road Start date Duration
Holme New Long Drove 26 May 2025 6 weeks. Working hours 8am to 6pm.
Sawtry Green End Road To be confirmed  
Yaxley Dovecote Lane To be confirmed  
Wistow Mill Road To be confirmed  
Holme Long Drove To be confirmed  
Yaxley Main Street To be confirmed  
The Stukeleys Spittals Way To be confirmed  
Godmanchester Cambridge Road To be confirmed  
Hemingford Abbots Rideaway To be confirmed  
Ramsey Forty Foot Forty Foot Bank To be confirmed  
Buckworth Barham Road To be confirmed  

Surface treatment work

We use different types of surface treatments to repair your roads, to learn why please visit our types of road surface treatment page.

2025-2026 programmes

Parish / Town Road Start date Duration Type of work
Buckden The Oslers 1 April 2025 Completed Micro asphalt
Buckden Springfield Close 1 April 2025 Completed Micro asphalt
Hemingford Grey The Rampleys 2 April 2025 Completed Micro asphalt
Yaxley Laburnum Avenue 12 April 2025 Completed Micro asphalt
Huntingdon Maryland Avenue 14 April 2025 Completed Micro asphalt
Earith B1050 Colne Road  28 May 2025 1 day. Road closures between 9.30am to 3.30pm Surface dressing
Hartford A141 Huntingdon Northern Bypass 28 May 2025 1 day. Road closures between 9.30am to 3.30pm Surface dressing
Wood Walton B1090 Walton Hill 29 May 2025 2 days. Road closures between 9.30am to 3.30pm Surface dressing
Great GIdding Main Street 31 May 2025  1 day. Road closures between 8am and 5pm Surface dressing
Elton Bullock Road 31 May 2025  2 days. Road closures between 8am and 5pm Surface dressing
Fenstanton A1096 London Road 1 June 2025 1 day. Road closures between 8am and 5pm Surface dressing
Folksworth Washingley Lane 2 June 2025 8 days. Road closure and diversion Gripfibre (Micro asphalt)
Stilton Church Street 11 June 2025 2 days. Road closures between 9.30am to 2.30pm Gripfibre (Micro asphalt)
Yaxley Dovecote Lane 12 June 2025 2 days. Road closure and diversion Gripfibre (Micro asphalt)
Yaxley Church Street 13 June 2025 2 days. Road closure and diversion Gripfibre (Micro asphalt)
Yaxley Main Street 14 June 2025 4 days. Road closures between 9.30am to 2.30pm Gripfibre (Micro asphalt)

Crack sealing

2025-2026 programmes

Parish / Town Road Start date Duration
Stibbington New Lane To be confirmed  
Wyton-on-the-Hill St Ives Road A141 To be confirmed  
St Ives High Leys To be confirmed  
St Ives Green Leys/Paragon Road To be confirmed  
St Ives Edinburgh Drive  To be confirmed  
St Ives Burleigh Drive  To be confirmed  
Great Gransden Middle Street To be confirmed  

Large-scale road maintenance

Our large-scale road maintenance involves reconstruction to replace the top layers of the road and provide a stable support for vehicle movement. Works include, where needed, vegetation clearance, drainage, signage and road markings.

2025-2026 programmes

Parish / Town Road Start date Duration
Croxton Toseland Road To be confirmed  
Cottenham High Street To be confirmed  
Willingham Earith Road To be confirmed  
Great Shelford Tunwells Lane To be confirmed  
Pampisford Causeway To be confirmed  
Shudy Camps Main Street To be confirmed  
Harston London Road To be confirmed  
Cambourne Cambourne Road To be confirmed  
Waterbeach Clayhithe Road To be confirmed  
Graveley High Street To be confirmed  

Surface treatment work

We use different types of surface treatments to repair your roads, to learn why please visit our types of road surface treatment page.

2025-2026 programmes

Parish / Town Road Start date Duration Type of work
Histon Melvin Way 2 April 2025 Completed Micro asphalt
Waterbeach Payton Way 3 April 2025 Completed Micro asphalt
Waterbeach Spurgeons Way 7 April 2025 Completed Micro asphalt
Waterbeach Providence Way 8 April 2025 Completed Micro asphalt
Barton Kings Grove 9 April 2025 Completed Micro asphalt
Weston Green Horseshoes Lane 10 April 2025 Completed Micro asphalt
Fulbourn St Vigors Road 10 April 2025 Completed Micro asphalt
Fulbourn All Saints Road 10 April 2025 Completed Micro asphalt
Teversham Fulbourn Old Drift 10 April 2025 Completed Micro asphalt
Over Glover Street 6 May 2025 2 days. Road closures and diversion between 9.30am and 2.30pm Gripfibre (Micro asphalt)
Fulbourn Apthorpe Street / Cow Lane 7 May 2025 3 days. Road closures and diversion between 9.30am and 2.30pm Gripfibre (Micro asphalt)
Little Chishill Little Chishill Road 17 May 2025 1 day. Road closures between 8am and 5pm Surface dressing
Great Chishill May Street 17 May 2025 1 day. Road closures between 8am and 5pm Surface dressing
Litlington Royston Road 18 May 2025 1 day. Road closures between 8am and 5pm Surface dressing
Steeple Morden Cheyney Street 18 May 2025 1 day. Road closures between 8am and 5pm Surface dressing
Thriplow Gravel Pit Hill  18 May 2025 1 day. Road closures between 8am and 5pm Surface dressing
Horseheath Horseheath Green 19 May 2025 1 day. Road closures between 7.30am and 6pm Surface dressing
West Wratting B1052 Bull Lane 19 May 2025 1 day. Road closures between 9.30am and 3.30pm Surface dressing
Carlton Brinkley Road 20 May 2025 1 day. Road closures between 8am and 5pm Surface dressing
Fulbourn Teversham Road 20 May 2025 1 day. Road closures between 9.30am and 3.30pm Surface dressing
Over Gravel Bridge Road 27 May 2025 5 days. Road closure and diversion between 9.30am and 2.30pm Gripfibre (Micro asphalt)
Teversham Newmarket Road 18 June 2025 4 days. One way closure between 9.30am and 2.30pm Gripfibre (Micro asphalt)
Oakington Dry Drayton Road 24 June 2025 1 day. Road closure and diversion between 9.30am and 3.30pm Gripfibre (Micro asphalt)

Crack sealing

2025-2026 programmes

Parish / Town Road Start date Duration
Histon Station Road To be confirmed  
Impington Cambridge Road To be confirmed  

Roadwork and traffic information

Our interactive map gives you more detail on the latest roadworks, road closures and diversions. Works listed on this page are included.

Visit our road and traffic information page to access the map and instructions on how to use. Details of upcoming roadworks in PDF format are also provided.

The map uses data from Causeway one.network. Enter your road name and see the types of work happening today or in the next two weeks, three or twelve months.

You can also follow us on X (formerly Twitter) for updates on where we are working - @Cambs_Traffic

Can't find what you are looking for?

If you are unable to find a scheme on this page, it may be part of our reactive or cyclical maintenance programmes.

These works are more area based and include gully cleansing, road patching and public rights of way maintenance.

FAQ

Please read through our frequently asked questions. If you are unable to find the answer please contact us.

The work area is the section of the road where our operatives will be working. The road closure area often extends beyond this to manage through traffic and divert it on to an alternative route. This helps us do the work quickly and efficiently, while keeping residents, road users and the workforce safe. 

If you receive information notifying you about a road closure, we will include a map which indicates both the work and road closure areas if these are different.

As the work involves heavy plant and equipment, we cannot guarantee you will be able to access your property without having to wait or access via the other end of the works.

If you normally drive into or out of the work area during the hours when the closure is in place, we may ask you to please make alternative arrangements.

We will often phase works to try to reduce the disruption this can cause, and the site team will be available to communicate with residents and businesses regarding this.

We will always maintain access to properties if it is safe to do so. Delays will sometimes be unavoidable when we must move machinery or equipment out of the way. We thank you for your patience and cooperation while this is done.

Work is phased to allow property access from at least one end of the road. Access may differ, depending on where we are working.

We place advance warning signs at the starting points of our works at least 14 days before the work starts.

We will inform residents and businesses which are located with the area of work, via letter or leaflet drop, at least 14 days in advance of work starting, wherever possible.

We try to keep noise to a minimum, and plan noisier working activities for earlier on in shifts where we are working at night in residential areas. However, the work is being delivered using heavy plant and machinery and this will cause noise and disruption whilst the work is on site, especially where we are working overnight. To try to limit this we:

  • Consider alternative ways of working, for example during the day, instead of night, when working in residential areas at the weekend.
  • Working reduced hours overnight. This approach often means a longer delivery programme, whereas working longer shifts will result in the work being completed quicker.
  • Working during the day whenever we can to reduce costs and disruption to residents during unsociable hours.

Provided your speed is under 20mph, you can use a treated road approximately 20 minutes after a treatment product has been applied.

Please take care when using a newly laid road surface as some loose chippings are likely.

Please follow any temporary speed limits in place.

We can only lay road surface treatments in good weather. If the ground is still wet, it is raining, too hot or too cold for the surface treatment to be effective, we must postpone works until the weather conditions improve. This is to ensure the work is long-lasting and successful.

The schedule on this page is updated regularly to reflect any changes.

When choosing a route to use for diverted traffic, we use the same category or a higher category road as the temporarily closed road. This is to ensure the diversion route can cope with the same type of traffic as the temporarily closed road.

In certain rural locations, if there is no suitable alternative, we may have to divert using a lower category route. Please note that we only signpost approved diversion routes.

Sometimes, road users may choose to use an alternative local road. We do not have the powers to prevent highway users from using these alternative routes.

Contact

To report an issue with a road, please visit our report a highways fault page.

If you have any queries or require any additional information please email: highways@cambridgeshire.gov.uk

Capital maintenance programme

For more information on the workstreams covered please visit our capital maintenance programme page